-
Omer Katz authored
Schedule is simpler compared to the schedule in blink since it now returns deadlines based on marked bytes instead of time. If marking is ahead of schedule, return the minimum step size. Otherwise, set step size to catch up to schedule (ignoring the time passed while performing the step). No more default initial step size (needed in blink since marking speed was unknown). If estimated schedule is exceeded (marking takes longer than 500ms), the steps will try to mark all remaining objects but would still be capped by the maximum step duration of 2ms. Bug: chromium:1056170 Change-Id: I09857db161c621a12d064f9c8c21b646c34f9d71 Reviewed-on: https://chromium-review.googlesource.com/c/v8/v8/+/2375200 Commit-Queue: Omer Katz <omerkatz@chromium.org> Reviewed-by: Ulan Degenbaev <ulan@chromium.org> Reviewed-by: Anton Bikineev <bikineev@chromium.org> Cr-Commit-Position: refs/heads/master@{#69602}
f13c55d7