-
Carl Eugen Hoyos authored
The sample from ticket #2691 currently does not trigger "Consider increasing the value for analzeduration and probesize" because the audio streams are only added after calling estimate_timings(). Attached patch moves the message below this function call. Signed-off-by:
Michael Niedermayer <michaelni@gmx.at>
2492f777